{"id":5652,"date":"2018-02-07T11:13:54","date_gmt":"2018-02-07T10:13:54","guid":{"rendered":"http:\/\/www.cgt-lkn.org\/bizkaia\/gestamp\/?p=5652"},"modified":"2018-02-07T11:14:26","modified_gmt":"2018-02-07T10:14:26","slug":"gestamp-anuncia-entrada-en-marruecos-para-abastecer-a-psa-peugeot-y-renault","status":"publish","type":"post","link":"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/2018\/02\/07\/gestamp-anuncia-entrada-en-marruecos-para-abastecer-a-psa-peugeot-y-renault\/","title":{"rendered":"Gestamp anuncia entrada en Marruecos para abastecer a PSA-Peugeot y Renault"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"rg_ic rg_i alignleft\" src=\"https:\/\/encrypted-tbn0.gstatic.com\/images?q=tbn:ANd9GcSEabYBFH8ZcXQRVfqc-n-ZC9euJVzSwX0VTGruLaV-2GArisXZ\" alt=\"Resultado de imagen de gestamp\" width=\"331\" height=\"186\" \/><\/p>\n<p>La empresa espa\u00f1ola Gestamp, especializada en el dise\u00f1o y fabricaci\u00f3n de componentes de automoci\u00f3n, ha anunciado hoy su pr\u00f3xima instalaci\u00f3n en Marruecos en la regi\u00f3n de Kenitra, 40 kil\u00f3metros al norte de Rabat y donde la compa\u00f1\u00eda francesa PSA-Peugeot tiene anunciada una inversi\u00f3n millonaria.<\/p>\n<p>Esta ser\u00e1 la primera experiencia de Gestamp en \u00c1frica, y su f\u00e1brica, que se prev\u00e9 est\u00e9 operativa en 2019, dar\u00e1 servicio tanto a PSA-Peugeot, que estar\u00e1 en servicio en esa regi\u00f3n tambi\u00e9n en 2019, como al grupo Renault, que cuenta con una de sus mayores factor\u00edas en T\u00e1nger, a 200 kil\u00f3metros de Kenitra, inform\u00f3 la empresa en un comunicado.<\/p>\n<p>Gestamp se ha aliado en r\u00e9gimen de \u00abjoint-venture\u00bb (sociedad de riesgo compartido) con la empresa local Tuyauto, con la que se dedicar\u00e1n al ensamblaje de conjuntos soldados y de peque\u00f1a estampaci\u00f3n.<\/p>\n<p>Con su planta marroqu\u00ed, que dar\u00e1 trabajo a 120 personas, Gestamp suma as\u00ed Marruecos a una expansi\u00f3n internacional que le ha llevado a operar en 21 pa\u00edses y pronto tambi\u00e9n en Jap\u00f3n.<\/p>\n<p>El presidente ejecutivo de Gestamp, Francisco J. Riberas, justific\u00f3 as\u00ed la estrategia de la compa\u00f1\u00eda: \u00abMarruecos en particular y \u00c1frica en su conjunto se presentan como mercados emergentes con gran potencial de crecimiento para la fabricaci\u00f3n de veh\u00edculos\u00bb.<\/p>\n<p>Fuente agencia EFE.<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/?p=5652&amp;preview=true\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/encrypted-tbn0.gstatic.com\/images?q=tbn:ANd9GcSEabYBFH8ZcXQRVfqc-n-ZC9euJVzSwX0VTGruLaV-2GArisXZ\" alt=\"Resultado de imagen de gestamp\" width=\"331\" height=\"186\" \/><\/a>La empresa espa\u00f1ola Gestamp, especializada en el dise\u00f1o y fabricaci\u00f3n de componentes de automoci\u00f3n, ha anunciado hoy su pr\u00f3xima instalaci\u00f3n en Marruecos en la regi\u00f3n de Kenitra, 40 kil\u00f3metros al norte de Rabat y donde la compa\u00f1\u00eda francesa PSA-Peugeot tiene anunciada una inversi\u00f3n millonaria.<\/p>\n","protected":false},"author":72,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[5,1,13,21,22],"tags":[],"class_list":["post-5652","post","type-post","status-publish","format-standard","hentry","category-automocion","category-general","category-gestamp","category-peugeot","category-en-la-prensa"],"publishpress_future_action":{"enabled":false,"date":"2026-04-28 05:34:30","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/wp-json\/wp\/v2\/posts\/5652","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/wp-json\/wp\/v2\/users\/72"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/wp-json\/wp\/v2\/comments?post=5652"}],"version-history":[{"count":3,"href":"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/wp-json\/wp\/v2\/posts\/5652\/revisions"}],"predecessor-version":[{"id":5655,"href":"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/wp-json\/wp\/v2\/posts\/5652\/revisions\/5655"}],"wp:attachment":[{"href":"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/wp-json\/wp\/v2\/media?parent=5652"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/wp-json\/wp\/v2\/categories?post=5652"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cgt-lkn.org\/bizkaia-gestamp\/wp-json\/wp\/v2\/tags?post=5652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}